DSCO was engaged for the expansion of the existing Data Centre, with technical space of approximately 3,900 sqm. DSCO provided M&E Consultancy and Project Management for this project. This data centre is Citi’s main data processing site spanning across 2 levels of the building at Asia Pacific Processing Centre with 750nos. IT racks, total power consumption is 3MW.

This was the first Data Centre in Asia that has both IT loads and cooling supported by Diesel Rotary UPS (DRUPS). With DSCO’s design philosophy in line with both resiliency and efficiency, it became the first Data Centre within Asia to achieve LEED Gold Certification.