DSCO provided M&E Consultancy services to redevelop the Singapore Island Country Club swimming pool and bowling complex (Phase 1 works). The facilities include a 12 lane bowling alley, jackpot room, multi-purpose hall, steam rooms, gymnasium, dining, TV rooms, shower and changing rooms, car and buggy parking and a two tier gold driving range.

In addition, a total of three swimming pools were constructed, including an Olympic size pool built to FINA standard. A training pool, wading and play pool also provides facilities for children with water spouts, slides and bubble mats.

The following services were provided:

  • Air-conditioning & Mechanical Ventilation
  • HT & LT Power Reticulation
  • Sanitary & Drainage
  • Hot & Cold water reticulation
  • Fire Protection
  • Pool Filtration Plant
  • Lift Services

All works to the clubhouse were coordinated and successfully completed with minimum disruption and inconvenience to the on-going operations and its members.

No description available...