DSCO provided M&E Consultancy by managing the A&A works to the spa located on Level 5 at Mandarin Hotel, Singapore. The project is a renovation of the spa on level 5 with an area of 375 sqm.
The extent of the A&A works at this area included a total change of layout to the spa, extension of bridge from spa to poolside, addition of a steam room/sauna, total change of changing rooms, new air-conditioning and related M&E system such as power systems and distribution, general lights, fire detection and protection, plumbing and drainage.
In addition, the air-conditioning of the existing spa is obtained from the Atrium and it is the Hotel’s intention to provide a separate and independent AHU for the spa to achieve better control and to enable measurement of energy consumption for the air conditioning of the spa.