  • DSCO provided M&E Consultancy services by providing detailed design and testing for The Fort Data Centre at Changi South, Singapore. It is a conversion of an existing industrial building to a Data Centre with 12,000m2 technical space. It is an expansion projects for tenants encompassing over 2,500m2 white space each. The Fort Data centre is tailored to meet minimum TIA 942 Tier 3 standard.

    CLICK TO VIEW IN FULL

  • DSCO Group has been engaged to provide various M&E Consultancy services to GDS. These services included feasibility studies, due diligence works, peer review, technical audits, full design and testing & commissioning. The Kunshan data centre has an approximate area of 24,000m2, the Chengdu data centre has an approximate area of 119,930m2 and the WaiGaoQiao data centre has an approximate area of 22,000m2. GDS is China’s leading IT service provider of world class, high availability data centres. GDS has rapidly expanded its service offerings and coverage in China to over 15 data centres with an anticipated technical space of over 100,000m2.

    CLICK TO VIEW IN FULL

  • DSCO was appointed as the Lead and MEP Consultant for the colocation facility for Global Switch Singapore, located at Tai Seng Avenue, that was opened in December 2001. This brownfield project involved extensive modification to an existing industrial building to convert it for data centre usage. The total GFA is approximately 22,000m2 to house about 4,000 IT racks. The total power capacity is 20MW. DSCO also completed the concept design for Global Switch GS2 site at Woodlands, which is a Greenfield project.

    CLICK TO VIEW IN FULL

  • Equinix IBX data centres operate in 38 markets across 13 countries. DSCO was the MEP consultant for the Asia Pacific data centres for Pihana Pacific and iSTT when they were acquired by Equinix in 2003. Since then DSCO has provided MEP consultancy for Equinix throughout Asia. In Singapore, projects include: Site selection due diligence, various phases of expansion and upgrading of SG1 at Ayer Rajah, SG2 at Pioneer and the subsequent expansion phases and SG3 at Ayer Rajah and the subsequent expansion phases. This represents over 32,240m2 of colocation space in Singapore. In Hong Kong, projects include: site selection due diligence, HK1 initial build and expansion projects, HK2 testing and commissioning and HK3 & Hk4 Phase 2 fitout works. Since the recent acquisition of AsiaTone data centres, DSCO has also been appointed to carry out iPVTTM in Shanghai for SH5, SH6 & SH7. Equinix has over 92,900m2 of data centre space in Hong Kong and China of which DSCO designed about 50% of.

    CLICK TO VIEW IN FULL

  • DSCO was appointed as the Lead and MEP Consultant for the colocation facility for Global Switch Singapore, located at Tai Seng Avenue, that was opened in December 2001. This brownfield project involved extensive modification to an existing industrial building to convert it for data centre usage. The total GFA is approximately 22,000m2 to house about 4,000 IT racks. The total power capacity is 20MW. DSCO also completed the concept design for Global Switch GS2 site at Woodlands, which is a Greenfield project.

    CLICK TO VIEW IN FULL

  • DSCO has been working with DHL at various locations on a number of office expansion and fitout projects since 2003. In 2003, DSCO were involved in the fitting out of DHL at Parkview Square for their Regional Quality Control Centre and Server room with a total area of approximately 750m2. In 2004, DSCO provided M&E engineering consultancy services to DHL at Tai Seng for approximately 5,600m2 of office renovation including equipment room (approx.. 280m2) and regional call centre (100 desks). The upgrading completed in 4 phases in the same year. In 2005, DSCO provided M&E Engineering Consultancy Services to DHL at Tai Seng for approximately 1,600m2 office expansions. In 2011, DSCO were involved in the fitting out of DHL at Changi for approximately 2,300m2 office area which was completed in the same year. In 2014, DSCO was engaged to provide M&E Consultancy services to relocate the existing offices in Changi Hub to Swissport and to fitout offices, reception, meeting rooms and pantry at the new premises. The Swissport facility is an existing 3-Storey building with a total area of 35,600m2.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.

    CLICK TO VIEW IN FULL

  • DSCO was appointed to manage and design the new Greenfield data centre with an approximate area of 10,000m2. DSCO provided lead and full consultancy services as a consortium to provide the concept and schematic designs to allow for the local consultants to do the detailed designs and authority submissions. The overall masterplan design for the site was completed within 3 months, and day 1 data centre fitout of 1,500m2 technical space.

    CLICK TO VIEW IN FULL

  • DSCO provided Full lead and M&E Consultancy services for PT DCI’s Greenfield Data Centre in Jakarta, Indonesia that has a production area of 24,000m2. The entire site of 8 x buildings includes data centre, offices and a standalone utilities annex. The scope of work provided includes the overall site masterplan, concept and schematic designs to allow of local consultants to do the detailed designs and authority submissions. DSCO also provided review works and upgrading of the systems in order to obtain Uptime Institute Design Certificate. PT DCI is the first data centre in Indonesia and South East Asia to be awarded with Tier IV Design Certification by The Uptime Institute.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide Project Manager and M&E Consultancy services for a new data centre for VADS Bhd. It is a Greenfield project and a standalone data centre consisting of 2 stories with a land size of approximately 9 acres. The facility consists of 3 blocks; one admin block and two data centre blocks which will be constructed in phases. The facility was awarded with Tier III by The Uptime Institute.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide M&E consultancy services for a feasibility study and data centre upgrading works for Telin Singapore with an approximate area of 930m2. It is a standalone data centre that is upgraded to meet Uptime Tier III requirements.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide full Project management and M&E Design Consultancy Services for the end to end service for a new Greenfield Data Centre. The 5-storey building with a GFA of approximately 20,000m2 is a multi-tenanted data centre. The facility was awarded with Tier III by The Uptime Institute.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide full M&E consultancy services for this project which included a mission critical data centre environment as well as disaster recovery facilities. The fast tracked project involved the fitting out of approximately 6,970m2 to cater for an estimated head count in the order of 500. One of the key challenges of the project was the extent to which the base building infrastructure required to be modified or supplemented to achieve Barclay’s requirements for N+N redundancy. This is Barclay’s global support hub in addition to its office at Capital Square back then.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services which include full design and integrated systems testing service for Barclay’s new facility. The new facility is approximately 460m2 comprising of data centre, M&E plant space, IT support areas, trading rooms, meeting rooms, back offices and a pantry. The new data centre can accommodate 10 racks with its associated M&E plant room; a total of 70m2.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services for Edward Lifesciences, the global leader in the science of heart valves and hemodynamic monitoring with 7,730m2 new manufacturing facility in Changi North Crescent, Singapore which includes offices and laboratories. The “state of the art” facility produces Edwards’ world-leading Carpentier-Edwards Perimount tissue heart valve replacements, and also serves as the headquarters for Edwards’ Asia-Pacific operations, one of the company’s fastest-growing regions.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services to A*STAR for their new facility located at Biopolis, Singapore. It was a fast track 6,030m2 shell and core fit-out comprising of office and laboratory spaces and was completed within 6 months from design to handover. The Institute is a field strategic to Singapore’s Biomedical Sciences Initiatives as it plays a major role in infectious diseases, cancer, diabetes, lupus and other auto-immune diseases.

    CLICK TO VIEW IN FULL

  • DSCO provided full M&E Consultancy services to KYH International Pte Ltd for a 7,000m2 8 Storey industrial building and basement cold storage at 30 Alexandra Lane, Singapore. The new facility was procured on a design and build basis and DSCO provided the concept and schematic design and also, testing & commissioning.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services and designed the master planning of the plant rooms’ layout and provided technical advice on value engineering and production plant energy. DSCO had also provided peer review services on the design calculation and design drawings by the Local Design Institute. In addition, DSCO also peer reviewed shop drawings and construction drawings submitted by Design and Build Contractor. Upon completing Phase 2 of the production plant, DSCO scope of works expanded to provide the technical review for Phase 3 expansion which included an additional 10 storey dormitory, testing laboratory and cold store. The facility is located at Science Park of Gushu, Shenzhen, China with an approximate area of 36,553m2. The medical instruments production plant contains offices and production plants including clean room. Painting room, assembly lines and dangerous goods store.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services for Abbott Laboratories to manage the fitout works of its new regional head office at Vision Crest Commercial Tower, Singapore. The final area that is occupied is approximately 2,200m2 and consists of a reception, boardrooms, meeting rooms, utility, workstations and offices. It took approximately 6 months from awarding of consultants to project close out.

    CLICK TO VIEW IN FULL

  • DSCO Group has been working with Visa at Singapore Post Centre on a number of office expansion and A&A projects, totally over 9,300m2. In 2005, DSCO were involved in the fitout works of Visa’s premises at level 7 of Singapore Post Centre that comprised of 930m2 of data centre space, command centre and 2,300m2 of office space. In 2008, another office fitout of approximately 1,600m2 of office space was completed. In 2010, Visa confirmed the space acquisition and office fitout of level 7 in Singapore Post Centre approximately 1,600m2 of office space. In 2012, Visa office space on level 11 of their offices in Singapore Post Centre with approximately 3,700m2 with an internal staircase between 10th and 11th floor. The new workspace includes open plan workstations, reception, meeting rooms and pantry areas. Visa was awarded with Green mark Award Gold for Level 7 – 10 and Green mark Award Platinum for Level 11.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide full M&E Design Consultancy Services for Amex’s new office premises at Marina Bay Financial Centre, as the new corporate real estate facilities. Full M&E Consultancy and iPVTTM was required for the base building infrastructure. The office fitout area was approximately 2,300m2. Sensible energy features were also incorporated in the MEP design to save on energy cost. The facility was awarded with Green mark Award Gold.

    CLICK TO VIEW IN FULL

  • DSCO provided full M&E Design Consultancy services to Barclays Capital for the fitout of approximately 6,500m2 of office space. The area comprised of back office functions to accommodate over 700 staffs, meeting rooms, and conference rooms, IT rooms with racks, generators and plant room equipment.

    CLICK TO VIEW IN FULL

  • DSCO provided full M&E Design Consultancy to Barclays Capital for the fitout works for their new office at Marina Bay Financial Centre. The new office is to consolidate its Singapore back office functions. The facility accommodates approximately 4,000 headcount over 14 floors in Tower 2. The total project size is approximately 32,500m2.

    CLICK TO VIEW IN FULL

  • DSCO has been working with DHL at various locations on a number of office expansion and fitout projects since 2003. In 2003, DSCO were involved in the fitting out of DHL at Parkview Square for their Regional Quality Control Centre and Server room with a total area of approximately 750m2. In 2004, DSCO provided M&E engineering consultancy services to DHL at Tai Seng for approximately 5,600m2 of office renovation including equipment room (approx.. 280m2) and regional call centre (100 desks). The upgrading completed in 4 phases in the same year. In 2005, DSCO provided M&E Engineering Consultancy Services to DHL at Tai Seng for approximately 1,600m2 office expansions. In 2011, DSCO were involved in the fitting out of DHL at Changi for approximately 2,300m2 office area which was completed in the same year. In 2014, DSCO was engaged to provide M&E Consultancy services to relocate the existing offices in Changi Hub to Swissport and to fitout offices, reception, meeting rooms and pantry at the new premises. The Swissport facility is an existing 3-Storey building with a total area of 35,600m2.

    CLICK TO VIEW IN FULL

  • DSCO was engaged by Changi Airport Group in 2012 to provide M&E Consultancy services for the fitout works for a staff lounge in Terminal 1 of Singapore Changi Airport. The lounge has an approximate area of 155m2 and is used exclusively by the airport staff.

    CLICK TO VIEW IN FULL

  • DSCO has been working with BoAML at various locations on a number of office expansion, fitout and A&A projects. At HarbourFront, DSCO was engaged to provide M&E Consultancy services in 2010 for the office fitout to accommodate the deployment of the Cisco Telepresence System. The project included the conversion of an existing medical centre area into a telepresence room and existing office area into 2 no. sick room. In 2011, DSCO provided Due Diligence Study and M&E Engineering for new office fitout of 750m2.

    CLICK TO VIEW IN FULL

  • DSCO was engaged by Tata Communications to provide M&E Engineering Consultancy services for the office fitout works at TCX Building at Tai Seng. The area of approximately 2,790m2 consists of workstations, pantry, meeting rooms, conference rooms, server room and offices.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide M&E Consultancy services to relocate Tudor’s Singapore office to Marina Bay Financial Centre Tower 2. The new office facility was approximately 465m2 with 18 trading positions, offices, server room, and reception and meeting rooms. Tudor reused the existing furniture and systems and the migration were carried out over the weekends followed by the reinstatement works of the existing office.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide full M&E Design Consultancy services for Amex at their new office premises at Mapletree Business City as the new corporate real estate facility. Amex occupied approximately 6,900m2 of office fitout of 3 consecutive floors, each measuring approximately 2,300m2. A Tier 3 data centre is also housed there which consists of approximately 60 racks measuring an estimate of 220m2. iPVTTM was also required for the base building infrastructure. Sensible energy features were also incorporated in the MEP design to save on energy cost. The facility was awarded with Green mark Award GoldPLUS.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide M&E Consultancy Services for Capital Group’s new office fitout of approximately 3,160m2 with an internal staircase, Levels 32 & 33 of the North Tower at One Raffles Quay, Singapore. The space includes open plan workstations, offices, data centre, meeting rooms, conference rooms, pantry and trading room for 6 dealers.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide M&E Engineering services for iCap to relocate their operations into Tower 2 of Marina Bay Financial Centre, Singapore. The fitout area was approximately 3,070m2 which consist of offices, server room, trading room for 200 brokers and data centre up to 60 racks. The requirement is for the MEP services supporting the critical areas to be provided with N+1 redundancy.

    CLICK TO VIEW IN FULL

  • DSCO provided regional M&E Design and project support Consultancy services for Macquarie Bank. Due to the acquisition of ING’s Equities, Macquarie Bank expanded and upgraded their existing premises throughout the region. DSCO’s scope of services ranged from full peer review design and project delivery services. Full M&E Consultancy services were provided in Capital Square, Singapore (approx. 1,670m2), Citic Tower, Hong Kong (approx. 700m2) and Hong Kong Disaster Recovery Site (approx. 175m2). Performance Design Consultancy was provided in Tokyo, Japan (approx. 1,300m2). Peer review and technical review services were provided in Seoul, South Korea (approx. 1,580m2), Bangkok, Thailand (approx. 865m2), Kuala Lumpur, Malaysia (approx. 520m2) and Jakarta, Indonesia (approx. 900m2). The scope of services included power distribution, standby power generation, UPS, air-conditioning, lighting, fire protection and security.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy Services for UBS AG’s new Singapore Headquarters at One Raffles Quay, Singapore, which comprised a total area of approximately 15,800m2. DSCO were appointed as the MEP Consultant for the mission critical areas namely the trading room and data centre. The data centre Day 1 fitout works was 630m2 and ultimately 1,000m2, based on 1000W/m2. The trading room was based on about 200 traders at 750W/desk.

    CLICK TO VIEW IN FULL

  • DSCO were appointed to provide Full M&E Design Consultancy services and performance testing of the critical systems for ABN Amro for the fitout works of approximately 16,700m2 of office space including space for 330 traders and a 60 rack data centre. ABN Amro did not install any of their own infrastructure, they made use of the Landlord’s infrastructure albeit upgraded to cater for the anticipated loading requirements. The designs of the MEP systems supporting the Critical data centre were in accordance with an N+1 philosophy for resilience and redundancy. For the trading room to meet the requirements of 400watts/desk IT load, the design made use of naturally ventilated trading desks with the base building AHU upgraded. This upgrading was possible as ABN Amro committed to the building whilst it was in the early stage of construction and such upgrades were issued to the base building main contractor.

    CLICK TO VIEW IN FULL

  • Project Description: DSCO provided M&E Consultancy Services to Prudential by fitting out their office at Marina Bay Financial Centre, which occupied one and a half floors of approximately 3,400m2. DSCO was in-charge of the full M&E design up till handover. The fitout includes a reception, boardroom, meeting room, telepresence room, enclosed office, wet pantry, utilities and general office.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy Services to AB Global for the fitout works of their new premises at One Raffles Quay Level 27 with an approximate area of 865m2. The fitout includes workstations, offices, meeting room, production room, server room, storage room, boardroom, pantry and reception.

    CLICK TO VIEW IN FULL

  • DSCO provided full M&E Consultancy services for the office renovation works to Starhub’s office at Tai Seng, Singapore. The 2,500m2 office consists of meeting rooms, conference rooms, GIS room, test rooms, patch room, reception and generally office ancillary areas. A workstation office area was also provided for approximately 200 staff.

    CLICK TO VIEW IN FULL

  • DSCO undertook the complete building services design consultancy for the People’s Republic of China Consulate in Sydney, Australia. The Consulate is located at 5-43 Dunblane Street Camperdown, NSW, Australia. The building comprises of main administration building with offices, meeting & conference rooms, function rooms, dining rooms, separate residence and recreation buildings. The site area was approximately 9,000m2.

    CLICK TO VIEW IN FULL

  • DSCO were appointed to provide full M&E Consultancy services including building due diligence for the selection of an appropriate building based on Electroglas requirements and full M&E Design Consultancy of the production plant, warehouse and office space. This 5,000m2 manufacturing facility was relocated to Loyang, Singapore from San Jose, California. The works included a Class 100 clean air environment, compressed air system, vacuum air system and 120v, 60 Hz electrical supply for the production plant.

    CLICK TO VIEW IN FULL

  • This 2,000m2 research and development facility is a fragrance and compounding facility containing offices, production areas and laboratories. DSCO provided the M&E services and assisted the Architects in this Fast-track design and build contract and was completed in 1996. In 2003, DSCO were appointed to provide full M&E Consultancy services for a two bay extension to the existing four storey office and laboratory block and a total retrofit to the second storey of the production block. This included provision of 100% pre-cooled fresh air, humidity control, laboratory pressure controls and laboratory extracts to certain areas. Pressure controls, extracts and specialised filters were used for the control of odour transmission.

    CLICK TO VIEW IN FULL

  • DSCO provided Lead and M&E Consultancy Services for BoAML’s new office space in Hong Kong Island. It is of 7 Storeys, with 2 individual mechanical floors, accommodates 1,314 number of seats and has an approximate area of 13,000m2. The facility is LEED certified.

    CLICK TO VIEW IN FULL

  • DSCO provided Lead and M&E Consultancy services for the upgrading works of Deutsche Bank’s main equipment room and main technology room at Cheung Kong Centre. This includes the UPS, Chiller, Generators and risers to be upgraded from N to N+N. This project is also a 100% expansion of the main technology room and expansion of trading floors.

    CLICK TO VIEW IN FULL

  • DSCO provided Lead and M&E Consultancy services for BoAML at Citibank Tower to upgrade their infrastructure. This includes the upgrading of the UPS system and power distribution for MCR and trading room from N to N+N configuration.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services by providing detailed design and testing for The Fort Data Centre at Changi South, Singapore. It is a conversion of an existing industrial building to a Data Centre with 12,000m2 technical space. It is an expansion projects for tenants encompassing over 2,500m2 white space each. The Fort Data centre is tailored to meet minimum TIA 942 Tier 3 standard.

    CLICK TO VIEW IN FULL

  • DSCO Group has been engaged to provide various M&E Consultancy services to GDS. These services included feasibility studies, due diligence works, peer review, technical audits, full design and testing & commissioning. The Kunshan data centre has an approximate area of 24,000m2, the Chengdu data centre has an approximate area of 119,930m2 and the WaiGaoQiao data centre has an approximate area of 22,000m2. GDS is China’s leading IT service provider of world class, high availability data centres. GDS has rapidly expanded its service offerings and coverage in China to over 15 data centres with an anticipated technical space of over 100,000m2.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy, which included site MEP feasibility study, development of project design brief, review of detailed design by the local consultant team and conducting integrated performance verification testing (iPVTTM) for PT Bank UOB Buana Data Centre project at UOB Thamrin 9 building in Jakarta, Indonesia. The new data centre designed to Tier 3 standard has a total area of 500m2 and comprises of server room, media vault room, operator console room, tape drive room and printer room.

    CLICK TO VIEW IN FULL

  • DSCO provided the lead and M&E Consultancy services for Fujitsu, and collaborated with the local design institute to provide architectural and structural consultancy for their Greenfield data centre with a total built up area of 9,000m2. The total power supply capacity is 5MW, with approximately 1,000 IT racks. This data centre is the first in China that utilises dynamic rotary UPS to support both IT and cooling loads.

    CLICK TO VIEW IN FULL

  • DSCO was appointed to manage and design the new Greenfield data centre with an approximate area of 10,000m2. DSCO provided lead and full consultancy services as a consortium to provide the concept and schematic designs to allow for the local consultants to do the detailed designs and authority submissions. The overall masterplan design for the site was completed within 3 months, and day 1 data centre fitout of 1,500m2 technical space. The facility was awarded Uptime Institute Tier III.

    CLICK TO VIEW IN FULL

  • DSCO Group was engaged for the expansion of the existing data centre, with technical space of approximately 3,900m2. DSCO provided full M&E Engineering Consultancy and Project Management services. This data centre is Citi’s main data processing site spanning across 2 levels of the building at Asia Pacific Processing Centre with 750nos. IT racks, total power consumption is 3MW. DSCO was the M&E Consultant and the first data centre in Asia with both IT loads and cooling supported by Diesel Rotary UPS (DRUPS). With DSCO’s design philosophy in line with both resiliency and efficiency, it became the first data centre within Asia to achieve LEED Gold Certification.

    CLICK TO VIEW IN FULL

  • Both SingTel KCTC1 and KCTC2 are Greenfield purpose built data centres. Each are Tier 4 design with DC technical space of 15,000m2 each. The data centre facilities were procured on a Design and Build basis. DSCO were engaged to provide peer review of the design to ensure that the designs are in accordance with TIA 942 Tier 4. As a result of the review, the proposed recommendations for changes were implemented. On completion of the construction works, DSCO was engaged to carry out integrated performance verification testing (iPVTTM). Subsequently, DSCO was engaged as the Lead and M&E Consultant for the fitout of 5 floors at KCTC2.

    CLICK TO VIEW IN FULL

  • United Overseas Bank’s new Greenfield data processing site comprises of 2 levels of white space of 6,000m2. The existing carpark was demolished to construct the new data centre. With guidelines provided by BCA, this became the 1st commercial Hardened Operations Centre (HOC) in Singapore. DSCO was engaged as the M&E Consultant involved from design to testing & commissioning.

    CLICK TO VIEW IN FULL

  • Equinix IBX data centres operate in 38 markets across 13 countries. DSCO was the MEP consultant for the Asia Pacific data centres for Pihana Pacific and iSTT when they were acquired by Equinix in 2003. Since then DSCO has provided MEP consultancy for Equinix throughout Asia. In Singapore, projects include: Site selection due diligence, various phases of expansion and upgrading of SG1 at Ayer Rajah, SG2 at Pioneer and the subsequent expansion phases and SG3 at Ayer Rajah and the subsequent expansion phases. This represents over 32,240m2 of colocation space in Singapore. In Hong Kong, projects include: site selection due diligence, HK1 initial build and expansion projects, HK2 testing and commissioning and HK3 & Hk4 Phase 2 fitout works. Since the recent acquisition of AsiaTone data centres, DSCO has also been appointed to carry out iPVTTM in Shanghai for SH5, SH6 & SH7. Equinix has over 92,900m2 of data centre space in Hong Kong and China of which DSCO designed about 50% of.

    CLICK TO VIEW IN FULL

  • DSCO was appointed as the Lead and MEP Consultant for the colocation facility for Global Switch Singapore, located at Tai Seng Avenue, that was opened in December 2001. This brownfield project involved extensive modification to an existing industrial building to convert it for data centre usage. The total GFA is approximately 22,000m2 to house about 4,000 IT racks. The total power capacity is 20MW. DSCO also completed the concept design for Global Switch GS2 site at Woodlands, which is a Greenfield project.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services to Sify Technologies for a Data Centre in Mumbai, India and was in charge of designing approximately 8,400m2 technical colocation space; 6 floors of the building based on a combination of 1440kW pods with each of the data halls of typical design in accordance with Sify’s design parameters used in the new Noida design.

    CLICK TO VIEW IN FULL

  • Digital Realty Trust’s Singapore Data Center (SIN10) is a 7 storey new built facility approximately 50,000m2. It is currently the largest colocation data centre in Singapore. The new data centre facility was procured on a design and build basis and is designed to TIA942 Tier 3 requirements. The building was designed to provide a total power capacity of 60MW, with 8000 IT racks. DSCO provided the MEP design consultancy and peer review of the D&B contractor for the base building design under Japan Land Asia. DSCO then provided M&E Design Consultancy to handle the fitout works at level 6 & 7 under Digital realty. Level 6 comprises of 3 x pods that is Built to Suit (BTS) an area of about 2,230m2, with each pod custom designed to cater for 1000kW IT load, while Level 7 comprises of 5 x pods that is Built to Suit (BTS) an area of about 3,720m2, with the new data centre pods housing a total of 1000 racks each pod being custom designed to cater for 1,200kW IT load.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Engineering Peer Review for the new build data centre building in Jakarta with 8 floors and 3 basements of total net area of 12,355m2 with 24MVA. The M&E peer review engineering included design review, review during construction and typical DC tenant fitout design.

    CLICK TO VIEW IN FULL

  • DSCO provided Full lead and M&E Consultancy services for PT DCI’s Greenfield Data Centre in Jakarta, Indonesia that has a production area of 24,000m2. The entire site of 8 x buildings includes data centre, offices and a standalone utilities annex. The scope of work provided includes the overall site masterplan, concept and schematic designs to allow of local consultants to do the detailed designs and authority submissions. DSCO also provided review works and upgrading of the systems in order to obtain Uptime Institute Design Certificate. PT DCI is the first data centre in Indonesia and South East Asia to be awarded with Tier IV Design Certification by The Uptime Institute.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters. The facility was awarded Uptime Institute design certified Tier III by The Uptime Institute.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide M&E consultancy services for a feasibility study and data centre upgrading works for Telin Singapore with an approximate area of 930m2. It is a standalone data centre that is upgraded to meet Uptime Tier III requirements.

    CLICK TO VIEW IN FULL

  • DSCO provided Lead and M&E Consultancy for space and supporting facility expansion at its Switch Centre with an area of approximately 1,860m2. The project is to convert the existing switch centre office area and service operation centre room into a professional equipment hosting area; Phase out legacy chiller plant on west side BMI rooftop by expanding chiller units on the east side rooftop; Install one additional generator and switchboard for output connection with other existing generator and upgrade Johnson Control Building Management System to the latest software load and expand the system HW/SW to support BACnet protocol.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services for NTT’s Greenfield Data Centre of approximately 27,000m2 with 13,500kW of IT Load in 9 data halls by conducting a Site Acceptance Test and Integrated Systems Test Services. NTT communications opened Phase 1 of the new Hong Kong Financial Data Centre (FDCTM) in Tseung Kwan O Industrial Estate with over 80% oh Phase 1 capacity in the new data centre was reserved prior to launch. It will incumbent on the firm to ensure that the design, function and quality of all MEPF services are value-added. Of primary concern is the reliability of the MEPF systems to suit this critical facility. Secondary inter-related matters that will be considered will be local regulations, energy and re-current costs, buildability, maintainability, flexibility and redundancy. The Tier IV ready facility boasts a 100% uptime service level, unrivalled security, connection to NT’s ultra-low latency networks and close proximity to the data centre operations of regional exchanges.

    CLICK TO VIEW IN FULL

  • HSBC intents to build a new Tier IV next generation data centre (NGDC). This is to meet its business expansion needs and its markets’ long-term development needs. Under its preliminary plan, HSBC constructed a 3 Storey data centre and IT office space with an approximate area of 13,300m2. DSCO provided Testing & Commissioning Consultancy for the data centre and supporting office and it has 5MW IT Load.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy Services by conducting a peer review for Fountain Shanghai Data Centre. The building has an approximate area of 6,000m2 and consists of 4 Storeys. The 1st floor included MEP area, lobby and reception whereas the 2nd to 4th floor are colocation areas.

    CLICK TO VIEW IN FULL

  • DSCO provided Lead MEP and Testing & Commissioning Consultancy for Watson Centre data centre at Kwai Chung, Hong Kong. The data centre of approximately 8,340m2 is separated into two phases. This includes dismantling and relocation of existing Industrial Water Tank, cooling towers, transformer rooms, LV switch rooms and Estate Management Office. Phase 1 includes about 2,000kVA IT Load and 800 racks, related MEP installations, fitout works, LG/F Fan Room, LG/F Underground Fuel Tank and Pump Room, LG/F Underground Water Tank and Pump Room, Chiller Plant room, generator room, UPS room, dismantling of existing Industrial water tank, cooling towers, all transformer rooms, all LV switch rooms and all infrastructure facilities. Phase 2 includes another 3,000kVA and 1,200 racks, related MEP installation, fitout works, UPS room, generator room, cooling towers, existing service relocations and diversions.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services by manging the A&A works to the spa located on Level 5 at Mandarin Hotel, Singapore. The project is a renovation of the spa on level 5 with an area of 375m2. The extent of the A&A works at this area includes a total change of layout to the spa, extension of bridge from spa to poolside, addition of a steam room/sauna, total change of changing rooms, new air-conditioning and related M&E system such as power systems and distribution, general lights, fire detection and protection, plumbing and drainage. In addition, the air-conditioning of the existing spa is obtained from the Atrium and it is the Hotel’s intention to provide a separate and independent AHU for the spa to achieve better control and to enable measurement of energy consumption for the air conditioning of the spa

    CLICK TO VIEW IN FULL

  • The Singapore Flyer was out of operation due to a failure in the electrical system in December 2008. DSCO was appointed to conduct a feasibility study and implementation of electrical distribution system to the capsules. In addition to the secondary backup system already in place from our earlier work phase, Singapore Flyer also required power supply to the capsules (especially for air-conditioning) to be maintained in the event that a similar incident from happening. This power supply will ensure that the occupants within the capsules will have air-conditioning during the evacuation progression. As time was of the essence to resume the operations of The Singapore Flyer, DSCO completed the feasibility study within2 weeks.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services to redevelop the Singapore Island Country Club swimming pool and bowling complex (Phase 1 works). The facilities include a 12 lane bowling alley, jackpot room, multi-purpose hall, steam rooms, locker rooms, gymnasium, dining, TV rooms, shower and changing rooms, car and buggy parking and a two tier gold driving range. In addition, a total of three swimming pools were constructed, including an Olympic size pool built to FINA standard. A training pool, wading and play pool also provides facilities for children with water spouts, slides and bubble mats. The following services were provided: Air-conditioning & Mechanical Ventilation; HT & LT Power Reticulation; Sanitary & Drainage; Hot & Cold water reticulation; Fire Protection; Pool Filtration Plant and Lift Services. All works to the clubhouse were coordinated and successfully completed with minimum disruption and inconvenience to the on-going operations and its members.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services for The Banyan Tree Hotel and Resort Spa that opened in Shanghai in January 2003. The luxurious spa, located within the five star Westin hotel, has themed rooms illustrating the four Chinese elements of water, wind, fire and earth for each of its spas. DSCO provided specialist services for this prestigious project to meet the client’s own rigorous requirements for hydraulic, sanitary & drainage, air-conditioning & mechanical ventilation, lighting & electrical, ELV systems and fire protection.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services for Golden Village Multiplex Cinema in VivoCity. The Cineplex consists of 15 screens, 2,172 seats, 4 cinema types spread across two floors of entertainment occupying 8,400m2 of space and is the largest cinema complex then and was opened in September 2006.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services by conducting a feasibility study to convert and relocate the private O&G Clinic from Kent Ridge Wing Level 3 & 4, to the auditorium space. The existing clinic is around 520m2.

    CLICK TO VIEW IN FULL

  • DSCO was engaged by Pamfleet to manage major upgrading works and facelift of an existing commercial building at 108 Middle Road, Singapore, to comply with the latest building and fire codes. The works also included fitout of new offices approximately 490m2 on each floor. The building is 9 Storeys and zoned for retail and commercial use. The ground floor and mezzanine area retail use with the balance of the floors designated as commercial use.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services to Fairmont Swissotel by upgrading 371 rooms, air-conditioning systems, lobby, ink bar and driveway in 2012. This included the provision of plan layouts, piping and control schematics, installation details, schedule, accessories, air and water flow requirements and full specifications for the replacement of existing equipment.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services for the fitout works for Long Chim Thai Restaurant at The Shoppes, Marina Bay Sands that has an approximate area of 600m2. The scope of services provided were: Power supply, general lighting, emergency lighting, distribution mains, air-conditioning system, mechanical ventilation, hot & cold water distribution system, sanitation system, gas system, sprinkler system and fire alarm system.

    CLICK TO VIEW IN FULL

  • DSCO provided full M&E Consultancy services to Pure for the new facility with an approximate area of 1,200m2 by conducting a feasibility study of the new site to determine the suitability of the existing MEP services and then followed by full M&E Consultancy services on the 2nd floor of Knightsbridge for their new Fitness facility which consists of fitness studios, changing rooms, showers and reception.

    CLICK TO VIEW IN FULL

  • DSCO provided full M&E Consultancy services to Pure by providing A&A works for the new facility of size approximately 1,115m2 comprising of five yoga studios, changing rooms, showers, reception, retail and a lounge on the 18th floor of Ngee Ann City at Orchard Road, Singapore.

    CLICK TO VIEW IN FULL

  • DSCO provided full M&E Consultancy services to Pure by conducting the feasibility study and implementation on the 6th floor of Asia Square Tower with an approximate area of 2,980m2 for a fitness gym, and 465m2 on the 7th floor as new office premises.

    CLICK TO VIEW IN FULL

  • DSCO provided full M&E Consultancy services to Pure for the new facility of an approximate area of 1,075m2 that consists of 4 yoga studios, changing/locker rooms, showers, reception, retail and lounge on the 4th floor of Chevron House, Raffles City.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services for the MEP renovation Fitout works for the 4 Storey building with an approximate area of 3,900m2. It is to ensure that FSCPO and BFA is in compliance and the works consists of modification of existing staircases to certain width in full compliance with MOE requirement; extension of existing supermarket area to atrium; renovation of all public lavatories and accessible toilets from G/F to 3/F; demolition, strengthening and fill-up works at existing sunken courtyard to G/F level and additional staircase from 1/F to G/F.

    CLICK TO VIEW IN FULL

  • DSCO provided M&E Consultancy services and provided PM and Full M&E Consultancy services for the renovation MEP fitout works of wet market into a shopping centre. Based on the preliminary outline proposals of Kwai Hing Shopping Centre, DSCO is to develop design schemes and identify the best option for implementation and upgrade the LV switchboard from 1600A to 2500A and complete the building energy efficiency submission.

    CLICK TO VIEW IN FULL

  • 2,300m2 office space with full MEP Consultancy services and iPVTTM required for the base building infrastructure. Sensible energy features were incorporated in the MEP design to save on energy cost.

    CLICK TO VIEW IN FULL

  • Full MEP Consultancy services and iPVTTM required for base building infrastructure. American Express occupied approximately 7,000m2 of office space. The project included office fitout of 3 consecutive floors each measuring approximately 2,300m2. A Tier 3 Data Centre is housed at Mapletree Business City consisting of approximately 60 racks measuring an estimated 230m2. Sensible energy features were incorporated in the MEP design to save on energy cost.

    CLICK TO VIEW IN FULL

  • Full MEP Consultancy services and iPVTTM required for base building infrastructure. The office fitout include management offices and commercial investment banking facilities, infrastructures which include main data centre, approximately 60 racks and support functions. Sensible energy features were incorporated in the MEP design to save on energy cost.

    CLICK TO VIEW IN FULL

  • DSCO was engaged to provide MEP Consultancy for the fitout works for Deutsche Bank that consists of offices, meeting rooms, pantry etc. for the total floor area of approximately 25,000m2.

    CLICK TO VIEW IN FULL

  • DSCO provided full M&E Engineering Design Consultancy Services for SG2 with a total area of 16,800m2. This Data Centre is a co-location data centre service provider occupying two levels of data centre space. These two levels each has its own facility system to provide power and cooling to their respective data centre and also to provide a dual facility support system for the two levels.

    CLICK TO VIEW IN FULL

  • DSCO were involved in the fitout of Visa’s premises at level 7 of Singapore Post Centre that comprised of 930m2 of data centre space, and command centre and 2,300m2 office space. DSCO was also involved in another office fitout at level 10 of approximately 2,600m2.

    CLICK TO VIEW IN FULL

  • DSCO were involved in the fitout of Visa’s premises at Visa office space on level 11 of their offices in Singapore Post Centre with approximately 3,700m2 with an internal staircase between 10th and 11th floor. The new workspace includes open plan workstations, reception, meeting rooms and pantry areas.

    CLICK TO VIEW IN FULL


                                                                

  • Project Name: The Fort Data Centre Role: Providing detailed design and testing
    Area: Changi South, Singapore Client: The Fort Data Centre
    Completion Date: Project was completed in 2011.
    Project Description:
    DSCO provided M&E Consultancy services by providing detailed design and testing for The Fort Data Centre at Changi South, Singapore. It is a conversion of an existing industrial building to a Data Centre with 12,000m2 technical space. It is an expansion projects for tenants encompassing over 2,500m2 white space each. The Fort Data centre is tailored to meet minimum TIA 942 Tier 3 standard.
      Watch Video
  • Project Name: GDS Data Centre Role: M&E Consultancy services
    Area: Kunshan, Chengdu & WaiGaoQiao, China Client: GDS
    Completion Date: Project was completed in 2011.
    Project Description:
    DSCO Group has been engaged to provide various M&E Consultancy services to GDS. These services included feasibility studies, due diligence works, peer review, technical audits, full design and testing & commissioning. The Kunshan data centre has an approximate area of 24,000m2, the Chengdu data centre has an approximate area of 119,930m2 and the WaiGaoQiao data centre has an approximate area of 22,000m2. GDS is China’s leading IT service provider of world class, high availability data centres. GDS has rapidly expanded its service offerings and coverage in China to over 15 data centres with an anticipated technical space of over 100,000m2.
      Watch Video
  • Project Name: Global Switch Role: The Lead and MEP Consultant
    Area: Tai Seng, Singapore Client: The colocation facility for Global Switch Singapore
    Completion Date: Project was completed in 2001.
    Project Description:
    DSCO was appointed as the Lead and MEP Consultant for the colocation facility for Global Switch Singapore, located at Tai Seng Avenue, that was opened in December 2001. This brownfield project involved extensive modification to an existing industrial building to convert it for data centre usage. The total GFA is approximately 22,000m2 to house about 4,000 IT racks. The total power capacity is 20MW. DSCO also completed the concept design for Global Switch GS2 site at Woodlands, which is a Greenfield project.
      Watch Video
  • Project Name: Equinix Data Centre Role: MEP consultan & iSTT
    Area: Singapore, Hong Kong & China Client: Pihana Pacific, Equinix throughout Asia
    Completion Date: Project commenced since 2001, with various phases on-going.
    Project Description:
    Equinix IBX data centres operate in 38 markets across 13 countries. DSCO was the MEP consultant for the Asia Pacific data centres for Pihana Pacific and iSTT when they were acquired by Equinix in 2003. Since then DSCO has provided MEP consultancy for Equinix throughout Asia. In Singapore, projects include: Site selection due diligence, various phases of expansion and upgrading of SG1 at Ayer Rajah, SG2 at Pioneer and the subsequent expansion phases and SG3 at Ayer Rajah and the subsequent expansion phases. This represents over 32,240m2 of colocation space in Singapore. In Hong Kong, projects include: site selection due diligence, HK1 initial build and expansion projects, HK2 testing and commissioning and HK3 & Hk4 Phase 2 fitout works. Since the recent acquisition of AsiaTone data centres, DSCO has also been appointed to carry out iPVTTM in Shanghai for SH5, SH6 & SH7. Equinix has over 92,900m2 of data centre space in Hong Kong and China of which DSCO designed about 50% of.
      Watch Video
  • Project Name: A*STAR Singapore Immunology Network Role: M&E Consultancy services
    Area: Biopolis, Singapore Client: A*STAR
    Completion Date: Project was completed in March 2008.
    Project Description:
    DSCO provided M&E Consultancy services to A*STAR for their new facility located at Biopolis, Singapore. It was a fast track 6,030m2 shell and core fit-out comprising of office and laboratory spaces and was completed within 6 months from design to handover. The Institute is a field strategic to Singapore’s Biomedical Sciences Initiatives as it plays a major role in infectious diseases, cancer, diabetes, lupus and other auto-immune diseases.
      Watch Video
  • Project Name: DHL Role: M&E engineering consultancy services
    Area: Parkview Square, Tai Seng & Changi, Singapore Client: DHL
    Completion Date: Project was completed between the periods of 2003 – 2016.
    Project Description:
    DSCO has been working with DHL at various locations on a number of office expansion and fitout projects since 2003. In 2003, DSCO were involved in the fitting out of DHL at Parkview Square for their Regional Quality Control Centre and Server room with a total area of approximately 750m2. In 2004, DSCO provided M&E engineering consultancy services to DHL at Tai Seng for approximately 5,600m2 of office renovation including equipment room (approx.. 280m2) and regional call centre (100 desks). The upgrading completed in 4 phases in the same year. In 2005, DSCO provided M&E Engineering Consultancy Services to DHL at Tai Seng for approximately 1,600m2 office expansions. In 2011, DSCO were involved in the fitting out of DHL at Changi for approximately 2,300m2 office area which was completed in the same year. In 2014, DSCO was engaged to provide M&E Consultancy services to relocate the existing offices in Changi Hub to Swissport and to fitout offices, reception, meeting rooms and pantry at the new premises. The Swissport facility is an existing 3-Storey building with a total area of 35,600m2.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: PT Sigma Cipta Caraka. – Uptime Institute Tier III Role: To manage and design the new Greenfield data centre
    Area: Jakarta, Indonesia Client: The local consultants
    Completion Date: Project was completed in 2010.
    Project Description:
    DSCO was appointed to manage and design the new Greenfield data centre with an approximate area of 10,000m2. DSCO provided lead and full consultancy services as a consortium to provide the concept and schematic designs to allow for the local consultants to do the detailed designs and authority submissions. The overall masterplan design for the site was completed within 3 months, and day 1 data centre fitout of 1,500m2 technical space.
      Watch Video
  • Project Name: PT DCI Data Centre. – Uptime Institute Tier IV Role: Provided Full lead and M&E Consultancy services
    Area: Jakarta, Indonesia Client: PT DCI’s Greenfield Data Centre
    Completion Date: Project commenced since 2011 with various projects for the fitout of the DC hall still ongoing.
    Project Description:
    DSCO provided Full lead and M&E Consultancy services for PT DCI’s Greenfield Data Centre in Jakarta, Indonesia that has a production area of 24,000m2. The entire site of 8 x buildings includes data centre, offices and a standalone utilities annex. The scope of work provided includes the overall site masterplan, concept and schematic designs to allow of local consultants to do the detailed designs and authority submissions. DSCO also provided review works and upgrading of the systems in order to obtain Uptime Institute Design Certificate. PT DCI is the first data centre in Indonesia and South East Asia to be awarded with Tier IV Design Certification by The Uptime Institute.
      Watch Video
  • Project Name: VADS NusaJaya. – Uptime Institute Tier III Role: To provide Project Manager and M&E Consultancy services
    Area: Kuala Lumpur, Malaysia Client: VADS Bhd
    Completion Date: Project commenced in May 2014 and is currently in construction.
    Project Description:
    DSCO was engaged to provide Project Manager and M&E Consultancy services for a new data centre for VADS Bhd. It is a Greenfield project and a standalone data centre consisting of 2 stories with a land size of approximately 9 acres. The facility consists of 3 blocks; one admin block and two data centre blocks which will be constructed in phases. The facility was awarded with Tier III by The Uptime Institute.
      Watch Video
  • Project Name: Telin 1 Data Centre. – Uptime Institute Tier III Role: To provide M&E consultancy services for a feasibility study and data centre upgrading works
    Area: Changi, Singapore Client: Telin Singapore
    Completion Date: Project was completed in 2015 with various upgrading phases still ongoing
    Project Description:
    DSCO was engaged to provide M&E consultancy services for a feasibility study and data centre upgrading works for Telin Singapore with an approximate area of 930m2. It is a standalone data centre that is upgraded to meet Uptime Tier III requirements.
      Watch Video
  • Project Name: 1-Net North Data Centre. – Uptime Institute Tier III Role: To provide full Project management and M&E Design Consultancy Services
    Area: Woodlands, Singapore Client: New Greenfield Data Centre.
    Completion Date: Project commenced in 2014 and is currently in construction.
    Project Description:
    DSCO was engaged to provide full Project management and M&E Design Consultancy Services for the end to end service for a new Greenfield Data Centre. The 5-storey building with a GFA of approximately 20,000m2 is a multi-tenanted data centre. The facility was awarded with Tier III by The Uptime Institute.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: Sify Data Centre. – Uptime Institute Tier III Role: Provided M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters.
      Watch Video
  • Project Name: The Fort Data Centre Role: Providing detailed design and testing
    Area: Changi South, Singapore Client: The Fort Data Centre
    Completion Date: Project was completed in 2011.
    Project Description:
    DSCO provided M&E Consultancy services by providing detailed design and testing for The Fort Data Centre at Changi South, Singapore. It is a conversion of an existing industrial building to a Data Centre with 12,000m2 technical space. It is an expansion projects for tenants encompassing over 2,500m2 white space each. The Fort Data centre is tailored to meet minimum TIA 942 Tier 3 standard.
      Watch Video
  • Project Name: GDS Data Centre Role: M&E Consultancy services
    Area: Kunshan, Chengdu & WaiGaoQiao, China Client: GDS
    Completion Date: Project was completed in 2011.
    Project Description:
    DSCO Group has been engaged to provide various M&E Consultancy services to GDS. These services included feasibility studies, due diligence works, peer review, technical audits, full design and testing & commissioning. The Kunshan data centre has an approximate area of 24,000m2, the Chengdu data centre has an approximate area of 119,930m2 and the WaiGaoQiao data centre has an approximate area of 22,000m2. GDS is China’s leading IT service provider of world class, high availability data centres. GDS has rapidly expanded its service offerings and coverage in China to over 15 data centres with an anticipated technical space of over 100,000m2.
      Watch Video
  • Project Name: UOB Buana Data Centre Role: M&E Consultancy
    Area: Jakarta, Indonesia Client: PT Bank UOB Buana Data Centre project
    Completion Date: Project was completed in 2010.
    Project Description:
    DSCO provided M&E Consultancy, which included site MEP feasibility study, development of project design brief, review of detailed design by the local consultant team and conducting integrated performance verification testing (iPVTTM) for PT Bank UOB Buana Data Centre project at UOB Thamrin 9 building in Jakarta, Indonesia. The new data centre designed to Tier 3 standard has a total area of 500m2 and comprises of server room, media vault room, operator console room, tape drive room and printer room.
      Watch Video
  • Project Name: Fujitsu Data Centre Role: M&E Consultancy services
    Area: Nanhai, China Client: Fujitsu
    Completion Date: Project was completed in 2011.
    Project Description:
    DSCO provided the lead and M&E Consultancy services for Fujitsu, and collaborated with the local design institute to provide architectural and structural consultancy for their Greenfield data centre with a total built up area of 9,000m2. The total power supply capacity is 5MW, with approximately 1,000 IT racks. This data centre is the first in China that utilises dynamic rotary UPS to support both IT and cooling loads.
      Watch Video
  • Project Name: PT Sigma Cipta Caraka Role: To manage and design
    Area: Jakarta, Indonesia Client: The new Greenfield data centre
    Completion Date: Project was completed in 2010.
    Project Description:
    DSCO was appointed to manage and design the new Greenfield data centre with an approximate area of 10,000m2. DSCO provided lead and full consultancy services as a consortium to provide the concept and schematic designs to allow for the local consultants to do the detailed designs and authority submissions. The overall masterplan design for the site was completed within 3 months, and day 1 data centre fitout of 1,500m2 technical space. The facility was awarded Uptime Institute Tier III.
      Watch Video
  • Project Name: Citi Cintech II Data Centre Role: Full M&E Engineering Consultancy and Project Management services.
    Area: Science Park, Singapore Client: Asia Pacific Processing Centre
    Completion Date: Project was completed in 2003, with various phases still on-going.
    Project Description:
    DSCO Group was engaged for the expansion of the existing data centre, with technical space of approximately 3,900m2. DSCO provided full M&E Engineering Consultancy and Project Management services. This data centre is Citi’s main data processing site spanning across 2 levels of the building at Asia Pacific Processing Centre with 750nos. IT racks, total power consumption is 3MW. DSCO was the M&E Consultant and the first data centre in Asia with both IT loads and cooling supported by Diesel Rotary UPS (DRUPS). With DSCO’s design philosophy in line with both resiliency and efficiency, it became the first data centre within Asia to achieve LEED Gold Certification.
      Watch Video
  • Project Name: SingTel Data Centre KCTC1 & KCTC2 Role: Built data centres
    Area: Tai Seng, Singapore Client: Greenfield
    Completion Date: Project commenced since 2001, with various phases still ongoing.
    Project Description:
    Both SingTel KCTC1 and KCTC2 are Greenfield purpose built data centres. Each are Tier 4 design with DC technical space of 15,000m2 each. The data centre facilities were procured on a Design and Build basis. DSCO were engaged to provide peer review of the design to ensure that the designs are in accordance with TIA 942 Tier 4. As a result of the review, the proposed recommendations for changes were implemented. On completion of the construction works, DSCO was engaged to carry out integrated performance verification testing (iPVTTM). Subsequently, DSCO was engaged as the Lead and M&E Consultant for the fitout of 5 floors at KCTC2.
      Watch Video
  • Project Name: UOB Data Centre/td>

    Role: M&E Consultant involved from design to testing & commissioning
    Area: Alexandra, Singapore Client: United Overseas Bank’s new Greenfield data processing
    Completion Date: Project was completed in 2009.
    Project Description:
    United Overseas Bank’s new Greenfield data processing site comprises of 2 levels of white space of 6,000m2. The existing carpark was demolished to construct the new data centre. With guidelines provided by BCA, this became the 1st commercial Hardened Operations Centre (HOC) in Singapore. DSCO was engaged as the M&E Consultant involved from design to testing & commissioning.
      Watch Video
  • Project Name: Equinix Data Centre Role: MEP consultan & iSTT
    Area: Singapore, Hong Kong & China Client: Pihana Pacific, Equinix throughout Asia
    Completion Date: Project commenced since 2001, with various phases on-going.
    Project Description:
    Equinix IBX data centres operate in 38 markets across 13 countries. DSCO was the MEP consultant for the Asia Pacific data centres for Pihana Pacific and iSTT when they were acquired by Equinix in 2003. Since then DSCO has provided MEP consultancy for Equinix throughout Asia. In Singapore, projects include: Site selection due diligence, various phases of expansion and upgrading of SG1 at Ayer Rajah, SG2 at Pioneer and the subsequent expansion phases and SG3 at Ayer Rajah and the subsequent expansion phases. This represents over 32,240m2 of colocation space in Singapore. In Hong Kong, projects include: site selection due diligence, HK1 initial build and expansion projects, HK2 testing and commissioning and HK3 & Hk4 Phase 2 fitout works. Since the recent acquisition of AsiaTone data centres, DSCO has also been appointed to carry out iPVTTM in Shanghai for SH5, SH6 & SH7. Equinix has over 92,900m2 of data centre space in Hong Kong and China of which DSCO designed about 50% of.
      Watch Video
  • Project Name: Global Switch Role: The Lead and MEP Consultant
    Area: Tai Seng, Singapore Client: The colocation facility for Global Switch Singapore
    Completion Date: Project was completed in 2001.
    Project Description:
    DSCO was appointed as the Lead and MEP Consultant for the colocation facility for Global Switch Singapore, located at Tai Seng Avenue, that was opened in December 2001. This brownfield project involved extensive modification to an existing industrial building to convert it for data centre usage. The total GFA is approximately 22,000m2 to house about 4,000 IT racks. The total power capacity is 20MW. DSCO also completed the concept design for Global Switch GS2 site at Woodlands, which is a Greenfield project.
      Watch Video
  • Project Name: Sify Data Centre Role: M&E Consultancy services
    Area: Mumbai, India Client: The colocation facility for Global Switch Singapore
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Consultancy services to Sify Technologies for a Data Centre in Mumbai, India and was in charge of designing approximately 8,400m2 technical colocation space; 6 floors of the building based on a combination of 1440kW pods with each of the data halls of typical design in accordance with Sify’s design parameters used in the new Noida design.
      Watch Video
  • Project Name: Digital Realty Trust SIN10 Data Centre Role: Design and build basis
    Area: Jurong East, Singapore Client: TIA942 Tier 3
    Completion Date: The project was completed in 2015.
    Project Description:
    Digital Realty Trust’s Singapore Data Center (SIN10) is a 7 storey new built facility approximately 50,000m2. It is currently the largest colocation data centre in Singapore. The new data centre facility was procured on a design and build basis and is designed to TIA942 Tier 3 requirements. The building was designed to provide a total power capacity of 60MW, with 8000 IT racks. DSCO provided the MEP design consultancy and peer review of the D&B contractor for the base building design under Japan Land Asia. DSCO then provided M&E Design Consultancy to handle the fitout works at level 6 & 7 under Digital realty. Level 6 comprises of 3 x pods that is Built to Suit (BTS) an area of about 2,230m2, with each pod custom designed to cater for 1000kW IT load, while Level 7 comprises of 5 x pods that is Built to Suit (BTS) an area of about 3,720m2, with the new data centre pods housing a total of 1000 racks each pod being custom designed to cater for 1,200kW IT load.
      Watch Video
  • Project Name: NTT Communications Data Centre Role: M&E Engineering Peer Review
    Area: Jakarta, Indonesia Client: The new build data centre building
    Completion Date: Project was completed in 2010
    Project Description:
    DSCO provided M&E Engineering Peer Review for the new build data centre building in Jakarta with 8 floors and 3 basements of total net area of 12,355m2 with 24MVA. The M&E peer review engineering included design review, review during construction and typical DC tenant fitout design.
      Watch Video
  • Project Name: PT DCI Data Centre Role: Full lead and M&E Consultancy services
    Area: Jakarta, Indonesia Client: PT DCI’s Greenfield Data Centre
    Completion Date: Project commenced since 2011 with various projects for the fitout of the DC hall still ongoing.
    Project Description:
    DSCO provided Full lead and M&E Consultancy services for PT DCI’s Greenfield Data Centre in Jakarta, Indonesia that has a production area of 24,000m2. The entire site of 8 x buildings includes data centre, offices and a standalone utilities annex. The scope of work provided includes the overall site masterplan, concept and schematic designs to allow of local consultants to do the detailed designs and authority submissions. DSCO also provided review works and upgrading of the systems in order to obtain Uptime Institute Design Certificate. PT DCI is the first data centre in Indonesia and South East Asia to be awarded with Tier IV Design Certification by The Uptime Institute.
      Watch Video
  • Project Name: Sify Data Centre Role: M&E Design Consultancy Services
    Area: Noida, India Client: Sify Technologies
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Design Consultancy Services to Sify Technologies for a data centre in Noida, India. This includes the design for fitting-out approximately 16,800m2 of technical collocation space, fitout of 6 floors of the building, based on a combination of 1440kW and 720kW data halls with each of the data halls of typical design and in accordance with Sify’s design parameters. The facility was awarded Uptime Institute design certified Tier III by The Uptime Institute.
      Watch Video
  • Project Name: Telin 1 Data Centre Role: M&E consultancy services for a feasibility study and data centre upgrading works
    Area: Changi, Singapore Client: Telin Singapore
    Completion Date: Project was completed in 2015 with various upgrading phases still ongoing.
    Project Description:
    DSCO was engaged to provide M&E consultancy services for a feasibility study and data centre upgrading works for Telin Singapore with an approximate area of 930m2. It is a standalone data centre that is upgraded to meet Uptime Tier III requirements.
      Watch Video
  • Project Name: CSL Data Centre Role: Lead and M&E Consultancy for space and supporting facility expansion
    Area: Nita Centre, Tsuen Wan, Hong Kong Client: Switch Centre
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided Lead and M&E Consultancy for space and supporting facility expansion at its Switch Centre with an area of approximately 1,860m2. The project is to convert the existing switch centre office area and service operation centre room into a professional equipment hosting area; Phase out legacy chiller plant on west side BMI rooftop by expanding chiller units on the east side rooftop; Install one additional generator and switchboard for output connection with other existing generator and upgrade Johnson Control Building Management System to the latest software load and expand the system HW/SW to support BACnet protocol.
      Watch Video
  • Project Name: NTT Communications Financial Data Centre Role: M&E Consultancy services
    Area: Tseung Kwan O Industrial Estate, Hong Kong Client: NTT’s Greenfield Data Centre
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Consultancy services for NTT’s Greenfield Data Centre of approximately 27,000m2 with 13,500kW of IT Load in 9 data halls by conducting a Site Acceptance Test and Integrated Systems Test Services. NTT communications opened Phase 1 of the new Hong Kong Financial Data Centre (FDCTM) in Tseung Kwan O Industrial Estate with over 80% oh Phase 1 capacity in the new data centre was reserved prior to launch. It will incumbent on the firm to ensure that the design, function and quality of all MEPF services are value-added. Of primary concern is the reliability of the MEPF systems to suit this critical facility. Secondary inter-related matters that will be considered will be local regulations, energy and re-current costs, buildability, maintainability, flexibility and redundancy. The Tier IV ready facility boasts a 100% uptime service level, unrivalled security, connection to NT’s ultra-low latency networks and close proximity to the data centre operations of regional exchanges.
      Watch Video
  • Project Name: HSBC Data Centre Role: Testing & Commissioning Consultancy
    Area: Shek Mun, Hong Kong Client: Tier IV
    Completion Date: Project was completed in 2013.
    Project Description:
    HSBC intents to build a new Tier IV next generation data centre (NGDC). This is to meet its business expansion needs and its markets’ long-term development needs. Under its preliminary plan, HSBC constructed a 3 Storey data centre and IT office space with an approximate area of 13,300m2. DSCO provided Testing & Commissioning Consultancy for the data centre and supporting office and it has 5MW IT Load.
      Watch Video
  • Project Name: Fountain Shanghai Data Centre Role: M&E Consultancy Services
    Area: China Client: Tier IV
    Completion Date: Project was completed in 2014.
    Project Description:
    DSCO provided M&E Consultancy Services by conducting a peer review for Fountain Shanghai Data Centre. The building has an approximate area of 6,000m2 and consists of 4 Storeys. The 1st floor included MEP area, lobby and reception whereas the 2nd to 4th floor are colocation areas.
      Watch Video
  • Project Name: Hutchison Telecommunications Watson Data Centre Role: Lead MEP and Testing & Commissioning Consultancy
    Area: Kwai Ching, Hong Kong Client: Watson Centre data centre
    Completion Date: Project Phase 1 was completed in 2014 with phase 2 still ongoing.
    Project Description:
    DSCO provided Lead MEP and Testing & Commissioning Consultancy for Watson Centre data centre at Kwai Chung, Hong Kong. The data centre of approximately 8,340m2 is separated into two phases. This includes dismantling and relocation of existing Industrial Water Tank, cooling towers, transformer rooms, LV switch rooms and Estate Management Office. Phase 1 includes about 2,000kVA IT Load and 800 racks, related MEP installations, fitout works, LG/F Fan Room, LG/F Underground Fuel Tank and Pump Room, LG/F Underground Water Tank and Pump Room, Chiller Plant room, generator room, UPS room, dismantling of existing Industrial water tank, cooling towers, all transformer rooms, all LV switch rooms and all infrastructure facilities. Phase 2 includes another 3,000kVA and 1,200 racks, related MEP installation, fitout works, UPS room, generator room, cooling towers, existing service relocations and diversions.
      Watch Video
  • Project Name: Mandarin Oriental Hotel Role: M&E Consultancy services
    Area: Singapore Client: Mandarin Hotel, Singapore
    Completion Date: Project was completed in 2010.
    Project Description:
    DSCO provided M&E Consultancy services by manging the A&A works to the spa located on Level 5 at Mandarin Hotel, Singapore. The project is a renovation of the spa on level 5 with an area of 375m2. The extent of the A&A works at this area includes a total change of layout to the spa, extension of bridge from spa to poolside, addition of a steam room/sauna, total change of changing rooms, new air-conditioning and related M&E system such as power systems and distribution, general lights, fire detection and protection, plumbing and drainage. In addition, the air-conditioning of the existing spa is obtained from the Atrium and it is the Hotel’s intention to provide a separate and independent AHU for the spa to achieve better control and to enable measurement of energy consumption for the air conditioning of the spa.
      Watch Video
  • Project Name: Singapore Flyer Role: Feasibility study and implementation of electrical distribution system
    Area: Singapore Client: Capsules
    Completion Date: Project was completed in 2009.
    Project Description:
    The Singapore Flyer was out of operation due to a failure in the electrical system in December 2008. DSCO was appointed to conduct a feasibility study and implementation of electrical distribution system to the capsules. In addition to the secondary backup system already in place from our earlier work phase, Singapore Flyer also required power supply to the capsules (especially for air-conditioning) to be maintained in the event that a similar incident from happening. This power supply will ensure that the occupants within the capsules will have air-conditioning during the evacuation progression. As time was of the essence to resume the operations of The Singapore Flyer, DSCO completed the feasibility study within2 weeks.
      Watch Video
  • Project Name: Singapore Island Country Club Role: M&E Consultancy services
    Area: Singapore Client: Singapore Island Country Club swimming pool and bowling complex (Phase 1 works)
    Completion Date: Project was completed in 2003.
    Project Description:
    DSCO provided M&E Consultancy services to redevelop the Singapore Island Country Club swimming pool and bowling complex (Phase 1 works). The facilities include a 12 lane bowling alley, jackpot room, multi-purpose hall, steam rooms, locker rooms, gymnasium, dining, TV rooms, shower and changing rooms, car and buggy parking and a two tier gold driving range. In addition, a total of three swimming pools were constructed, including an Olympic size pool built to FINA standard. A training pool, wading and play pool also provides facilities for children with water spouts, slides and bubble mats. The following services were provided: Air-conditioning & Mechanical Ventilation; HT & LT Power Reticulation; Sanitary & Drainage; Hot & Cold water reticulation; Fire Protection; Pool Filtration Plant and Lift Services. All works to the clubhouse were coordinated and successfully completed with minimum disruption and inconvenience to the on-going operations and its members.
      Watch Video
  • Project Name: The Banyan Tree Spa Role: M&E Consultancy services
    Area: Shanghai, China Client: The Banyan Tree Hotel and Resort Spa
    Completion Date: Project was completed in 2003.
    Project Description:
    DSCO provided M&E Consultancy services for The Banyan Tree Hotel and Resort Spa that opened in Shanghai in January 2003. The luxurious spa, located within the five star Westin hotel, has themed rooms illustrating the four Chinese elements of water, wind, fire and earth for each of its spas. DSCO provided specialist services for this prestigious project to meet the client’s own rigorous requirements for hydraulic, sanitary & drainage, air-conditioning & mechanical ventilation, lighting & electrical, ELV systems and fire protection.
      Watch Video
  • Project Name: Golden Village Cinemas Role: M&E Consultancy services
    Area: VivoCity, Singapore Client: Golden Village Multiplex Cinema in VivoCity
    Completion Date: Project was completed in 2006.
    Project Description:
    DSCO provided M&E Consultancy services for Golden Village Multiplex Cinema in VivoCity. The Cineplex consists of 15 screens, 2,172 seats, 4 cinema types spread across two floors of entertainment occupying 8,400m2 of space and is the largest cinema complex then and was opened in September 2006.
      Watch Video
  • Project Name: National University Hospital (NUH) Role: M&E Consultancy services
    Area: Singapore Client: Kent Ridge Wing Level 3 & 4, to the auditorium space
    Completion Date: Project was completed in 2009.
    Project Description:
    DSCO provided M&E Consultancy services by conducting a feasibility study to convert and relocate the private O&G Clinic from Kent Ridge Wing Level 3 & 4, to the auditorium space. The existing clinic is around 520m2.
      Watch Video
  • Project Name: Pamfleet The Prospex Role: To manage major upgrading works and facelift of an existing commercial building
    Area: Middle Road, Singapore Client: Singapore
    Completion Date: Project was completed in 2015.
    Project Description:
    DSCO was engaged by Pamfleet to manage major upgrading works and facelift of an existing commercial building at 108 Middle Road, Singapore, to comply with the latest building and fire codes. The works also included fitout of new offices approximately 490m2 on each floor. The building is 9 Storeys and zoned for retail and commercial use. The ground floor and mezzanine area retail use with the balance of the floors designated as commercial use.
      Watch Video
  • Project Name: Fairmont Swissotel Role: M&E Consultancy services
    Area: Singapore Client: Fairmont Swissotel
    Completion Date: Project was completed in 2012.
    Project Description:
    DSCO provided M&E Consultancy services to Fairmont Swissotel by upgrading 371 rooms, air-conditioning systems, lobby, ink bar and driveway in 2012. This included the provision of plan layouts, piping and control schematics, installation details, schedule, accessories, air and water flow requirements and full specifications for the replacement of existing equipment.
      Watch Video
  • Project Name: Long Chim Restaurant Role: M&E Consultancy services
    Area: The Shoppes @ Marina Bay Sands, Singapore Client: Long Chim Thai Restaurant
    Completion Date: Project was completed in 2015.
    Project Description:
    DSCO provided M&E Consultancy services for the fitout works for Long Chim Thai Restaurant at The Shoppes, Marina Bay Sands that has an approximate area of 600m2. The scope of services provided were: Power supply, general lighting, emergency lighting, distribution mains, air-conditioning system, mechanical ventilation, hot & cold water distribution system, sanitation system, gas system, sprinkler system and fire alarm system.
      Watch Video
  • Project Name: Pure Group Role: M&E Consultancy services
    Area: Knightsbridge, Singapore Client: Pure for the new facility
    Completion Date: Project was completed in 2010.
    Project Description:
    DSCO provided full M&E Consultancy services to Pure for the new facility with an approximate area of 1,200m2 by conducting a feasibility study of the new site to determine the suitability of the existing MEP services and then followed by full M&E Consultancy services on the 2nd floor of Knightsbridge for their new Fitness facility which consists of fitness studios, changing rooms, showers and reception.
      Watch Video
  • Project Name: Pure Group Role: M&E Consultancy services
    Area: Ngee Ann City, Singapore Client: Pure
    Completion Date: Project was completed in 2006.
    Project Description:
    DSCO provided full M&E Consultancy services to Pure by providing A&A works for the new facility of size approximately 1,115m2 comprising of five yoga studios, changing rooms, showers, reception, retail and a lounge on the 18th floor of Ngee Ann City at Orchard Road, Singapore.
      Watch Video
  • Project Name: Pure Group Role: M&E Consultancy services
    Area: Asia Square Tower, Singapore Client: Pure
    Completion Date: Project was completed in 2011.
    Project Description:
    DSCO provided full M&E Consultancy services to Pure by conducting the feasibility study and implementation on the 6th floor of Asia Square Tower with an approximate area of 2,980m2 for a fitness gym, and 465m2 on the 7th floor as new office premises.
      Watch Video
  • Project Name: Pure Group Role: M&E Consultancy services
    Area: Chevron House, Raffles Place, Singapore Client: Pure
    Completion Date: Project was completed in 2008.
    Project Description:
    DSCO provided full M&E Consultancy services to Pure for the new facility of an approximate area of 1,075m2 that consists of 4 yoga studios, changing/locker rooms, showers, reception, retail and lounge on the 4th floor of Chevron House, Raffles City.
      Watch Video
  • Project Name: Mei Lam Estate Shopping Centre Role: M&E Consultancy services
    Area: Hong Kong Client: The MEP renovation Fitout works
    Completion Date: Project was completed in December 2014.
    Project Description:
    DSCO provided M&E Consultancy services for the MEP renovation Fitout works for the 4 Storey building with an approximate area of 3,900m2. It is to ensure that FSCPO and BFA is in compliance and the works consists of modification of existing staircases to certain width in full compliance with MOE requirement; extension of existing supermarket area to atrium; renovation of all public lavatories and accessible toilets from G/F to 3/F; demolition, strengthening and fill-up works at existing sunken courtyard to G/F level and additional staircase from 1/F to G/F.
      Watch Video
  • Project Name: Kwai Hing Market Role: M&E Consultancy services
    Area: Hong Kong Client: The renovation MEP fitout works of wet marke
    Completion Date: Project was completed in May 2014.
    Project Description:
    DSCO provided M&E Consultancy services and provided PM and Full M&E Consultancy services for the renovation MEP fitout works of wet market into a shopping centre. Based on the preliminary outline proposals of Kwai Hing Shopping Centre, DSCO is to develop design schemes and identify the best option for implementation and upgrade the LV switchboard from 1600A to 2500A and complete the building energy efficiency submission.
      Watch Video
  • Project Name: American Express International Inc. – Green Mark Award Gold Role: MEP Consultancy services and iPVTTM
    Area: Marina Bay Financial Centre, Tower 2, Level 15 Client: Base building infrastructure
    Completion Date: Project was completed in Q1 2011.
    Project Description:
    2,300m2 office space with full MEP Consultancy services and iPVTTM required for the base building infrastructure. Sensible energy features were incorporated in the MEP design to save on energy cost.
    Green Features:

    • Energy efficient air conditioning and lighting system with zoning and control
    • Provision of energy efficient IT equipment’s
    • Flexible open office design with provision of hot desks
    • Extensive use of environmentally friendly products and recycling facilities with good waste management
      Watch Video
  • Project Name: American Express International Inc. – Green Mark Award GoldPLUS Role: MEP Consultancy services and iPVTTM
    Area: Mapletree Business City, Tower C, Level 6, 7 & 8 Client: Base building infrastructure
    Completion Date: Project was completed in Q4 2010.
    Project Description:
    Full MEP Consultancy services and iPVTTM required for base building infrastructure. American Express occupied approximately 7,000m2 of office space. The project included office fitout of 3 consecutive floors each measuring approximately 2,300m2. A Tier 3 Data Centre is housed at Mapletree Business City consisting of approximately 60 racks measuring an estimated 230m2. Sensible energy features were incorporated in the MEP design to save on energy cost.
    Green Features:

    • Energy efficient air conditioning system and lighting system with zoning and control
    • Provision of energy efficient IT equipment
    • Flexible open office design with provision of hot desks
    • Extensive use of environmentally friendly products to promote a healthy indoor environment
    • Extensive recycling facilities and good waste management
      Watch Video
  • Project Name: Nomura Singapore Limited. – Green Mark Award Gold Role: MEP Consultancy services and iPVTTM
    Area: Marina Bay Financial Centre, Tower 2, Level 34, 35, 36 & 37 Client: Base building infrastructure
    Completion Date: Project completed in Q3 2011.
    Company:
    Nomura Singapore Limited is part of the Nomura Group, which is a leading financial services group and the preeminent Asian-based investment bank with worldwide reach.
    Project Description:
    Full MEP Consultancy services and iPVTTM required for base building infrastructure. American Express occupied approximately 7,000m2 of office space. The project included office fitout of 3 consecutive floors each measuring approximately 2,300m2. A Tier 3 Data Centre is housed at Mapletree Business City consisting of approximately 60 racks measuring an estimated 230m2. Sensible energy features were incorporated in the MEP design to save on energy cost.
    Green Features:

    • LED light fixtures that reduce lighting power
    • Water efficient fixtures in the pantry
    • Use of sustainable materials
      Watch Video
  • Project Name: Deutsche Bank AG, Asia Pacific Head Office. – Green Mark Award GoldPLUS Role: MEP Consultancy
    Area: One Raffles Quay, South Power, level 12-20 Client: Deutsche Bank
    Completion Date: Project completed in 2009.
    Company:
    Deutsche Bank Singapore is headquartered at One Raffles Quay and is the largest single tenant.
    Project Description:
    DSCO was engaged to provide MEP Consultancy for the fitout works for Deutsche Bank that consists of offices, meeting rooms, pantry etc. for the total floor area of approximately 25,000m2.
    Green Features:

    • Provision of energy efficient T5 lighting for office areas
    • Recycle bins available at all floors
    • Energy Star-labelled IT equipment
    • Global energy monitoring and tracking platform
      Watch Video
  • Project Name: Equinix Singapore Pte Ltd. – Green Mark Award GoldPLUS Role: M&E Engineering Design Consultancy Services
    Area: Pioneer Hub, SG2 Client: SG2
    Completion Date: Various projects are ongoing since 2003 – current.
    Project Description:
    DSCO provided full M&E Engineering Design Consultancy Services for SG2 with a total area of 16,800m2. This Data Centre is a co-location data centre service provider occupying two levels of data centre space. These two levels each has its own facility system to provide power and cooling to their respective data centre and also to provide a dual facility support system for the two levels.
    Green Features:

    • Using NEWater for ACMV system
    • Chiller plant system with efficiency of 0.70 kW/ton
    • Use of LED light fittings
    • Permanent measurement and verification instrumentation for the monitoring of chiller-water plant efficiency
    • Power Quality management System (PQMS) for remote monitoring, analysis, performance tracking & evaluation and report generation
      Watch Video
  • Project Name: Visa Worldwide. – Green Mark Award Gold Role: Office Fitout
    Area: Singapore Post Centre, level 7 & 10 Client: Singapore Post Centre
    Completion Date: Project completed in 2010.
    Project Description:
    DSCO were involved in the fitout of Visa’s premises at level 7 of Singapore Post Centre that comprised of 930m2 of data centre space, and command centre and 2,300m2 office space. DSCO was also involved in another office fitout at level 10 of approximately 2,600m2.
    Green Features:

    • Lighting zoning system at office areas
    • VAV system for air comfort at office areas
    • Purchase of energy efficient Energy Star office equipment
      Watch Video
  • Project Name: Visa Worldwide. – Green Mark Award Platinum Role: Fitout
    Area: Singapore Post Centre, Level 11 Client: Singapore Post Centre
    Completion Date: Project completed in Q3 2013.
    Project Description:
    DSCO were involved in the fitout of Visa’s premises at Visa office space on level 11 of their offices in Singapore Post Centre with approximately 3,700m2 with an internal staircase between 10th and 11th floor. The new workspace includes open plan workstations, reception, meeting rooms and pantry areas.
    Green Features:

    • 76% of total office areas are open office layouts which are zoned
    • AC system zoned for different occupancies usage with after office hour toggle
    • Lighting zoning created and equipped with motion sensors to automatically switch on the lighting accordingly to the occupancy’s presence request during office hours. Task light is installed on individual desk to allow greater controllability of the lighting system
    • 92% of office equipment are energy star rated to reduce energy usage. Timer provided for common printers and scanners
    • Potted plants and green wall in office interior up to 2.47% greenery. Green garden in level 10 connecting level 11 Visa with staircase to provide relaxation environment and to engage staff on both levels. Awareness education on greenery for Visa staff under corporate level by Visa Green committee
      Watch Video