OUR SERVICES
INTEGRATED SYSTEMS TESTING
Integrated Systems Testing is carried out prior to handover of the facility to ensure that all the systems operate in accordance with the design intent. It is the final test which determines if the design, equipment selection and construction meet the performance expectations.